This project entailed a comprehensive renovation to the linear accelerator vault for equipment upgrade, with the installation of an advanced process cooling chiller, base frame/raceways, and power conditioner, along with vault and control room renovations including new flooring, casework, drywall, paint, acoustical tile, electrical, and mechanical upgrades.