Moffitt Cancer Center Magnolia Provider Lounge

Tampa, FL

Transforming an existing office space into a new physicians lounge for Moffitt Cancer Center.

This project involved converting an existing office space into a spacious and comfortable physicians’ lounge, complete with a food preparation area, ample seating, and a tv section. The project involved extensive demolition and required level 3 ICRA compliance, as well as precise coordination with the hospital cafeteria and strict adherence to noise and disruption control measures to ensure minimal disturbance to patients, visitors, and staff. Located on the building’s basement level and constructed on a massive 5 ft thick mat slab, the project required innovative solutions such as injector pumps to pump waste from sink locations to the main drain, highlighting the level of technical expertise involved in the project execution.

Industry

Acute Care
0
projects
0 M+
sq.ft.
$ 0 M+
 

Related case studies

Explore additional case studies within this specific market segment.

Ready to bring your

dream to life?