The project involved the construction of a massive worship sanctuary spanning over 27,000 sq. ft., along with all the necessary site work. The building was made using sturdy and durable materials, such as concrete CMU (Concrete Masonry Units) for the walls and bar-joist for the roofing, which was further reinforced with standing seam roofing. This ensured that the structure was strong, long-lasting, and capable of withstanding extreme weather conditions. The attention to detail and careful selection of materials made this project an impressive feat of construction engineering.